Project Summary

This new-build home in NSW Ocean Shores required one consistent timber floor across two levels with different subfloor construction. Riverhill Floors Australian Classic 14/3mm engineered timber in Spotted Gum was selected for the project, with the installation approach adapted separately for the upstairs particleboard and downstairs concrete slab. 

Finished Project Photos

Job 3830 Ocean Shores Engineered Timber Installation — completed flooring installation
1 / 8

Project Story

The Goal

Create one consistent Spotted Gum timber floor across both levels of the new-build home, while using an installation approach suitable for the different subfloors upstairs and downstairs.

The Flooring Choice

Riverhill Floors Australian Classic 14/3mm engineered timber in Spotted Gum was selected to provide a consistent Australian timber appearance throughout the home. Using the same flooring across both levels created a seamless look despite the different construction underneath.

Our Approach

Because the two levels had different subfloors, the installation system was selected separately for each area. The upstairs particleboard and downstairs concrete slab were treated according to their individual requirements, allowing the same engineered timber flooring to be installed consistently throughout the home.

The Outcome

The completed installation achieved the consistent Spotted Gum look the homeowners wanted across both levels, while accommodating the different subfloor conditions beneath each area.

Installation Process

Real project photography showing the condition before work, site preparation, installation activity and finishing details where available.

Before

Job 3830 Ocean Shores Engineered Timber Installation - before installation 2 photos

The existing space before installation work began.

Preparation

Flooring preparation with protective floor covering and East Plank boards ready for installation. - site preparation 1 photo

Removal, cleaning and subfloor preparation before installation.

Installation

Job 3830 Ocean Shores Engineered Timber Installation - flooring installation in progress 2 photos

Main flooring installation activity.

Detailing

Job 3830 Ocean Shores Engineered Timber Installation - finishing detailing 1 photo

Finishing workmanship, trims, transitions and edges.

Project photos

Job 3830 Ocean Shores Engineered Timber Installation

Free Measure & Quote

Planning new flooring?

Tell our flooring team about your home or project. We can help you compare suitable products and arrange a free in-home measure and quote.